Six3Tile Shower
Tile Panels
Installs over existing tile
with a water-tight seal
—no demo needed,
just a fast, clean upgrade.
15 Second Shower Tile Panel Overview
Have outdated tile in your shower? Six3Tile simplifies shower renovations with large format tile panels. Designed for Multifamily Renovations and New Construction, this product is changing the way tile is done.
How to Install Six3Tile Shower or Tub Tile Panels
Six3Tile Shower Tile Panels can be installed 2.5 times faster than a ceramic tile shower and does not require special tools or skills.
Pricing
Our tile panels are easy to install
Contractor Installed Ceramic Tile Tub (CICTT)
$3000 USD
- Time
- 2-4 Days
- CICTT assumes
- Waterproofing substrates, 4x16 white subway (basic), Trim, grout, mortar
- Total Cost of Project
- $2800-$4000
Better Value
DIY Six3Tile Tub
$605 USD
Proven solution used in apartment renovations, new construction and home renovations since 2017
- Time
- 6 Hours
- Six3Tile assumes
-
Six3Tile pack, Trim, Grout & Adhesive
Items sold separately
- Total Cost of Project
- $650 - $750
DIY Six3Tile Benefits:
- Six3Tile is crafted from a high-performance polymer, similar to the durable PVC used in today’s most trusted building materials.
- Manufactured in the USA, ensuring consistent high product quality and reliable delivery
- Backed by manufacturer's 5-year warranty